VANCOUVER, BC / ACCESS Newswire / August 20, 2025 / Banyan Gold Corp. (the "Company" or "Banyan") (TSX-V:BYN)(OTCQB:BYAGF) announces the filing of the Technical Report to support the updated Mineral Resource Estimate ("MRE") in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards incorporated by reference in National Instrument 43-101 ("NI 43-101") for the AurMac Project (the "AurMac Property or "AurMac"). The Technical Report titled "Technical Report, AurMac Property, Mayo Mining District, Yukon Territory, Canada" and dated August 20, 2025, was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., Tysen Hantelmann, P.Eng., of JDS Energy & Mining Inc. and Deepak Malhotra, PhD., of Forte Dynamics. The Technical Report is available for review on SEDAR+ at www.sedar.ca and on the Company's website at www.banyangold.com.
As announced in the Company's news release dated July 8, 2025, the updated MRE comprises an Indicated Mineral Resource of 2.274 million ("M") ounces ("oz") of gold ("Au") (112.5 M tonnes at 0.63 g/t) and an Inferred Mineral Resource of 5.453 Moz of Au (280.6 M tonnes at 0.60 g/t ) (as defined in the CIM Definition Standards for Mineral Resources & Mineral Reserves incorporated by reference into NI 43‑101). The updated MRE is summarized below in Table 1 (Figure 1). The AurMac Project pit constrained MRE is contained in two near/on-surface deposits: the Airstrip and Powerline deposits. AurMac is road accessible and is transected by an existing transmission line of the Yukon's power grid. The AurMac Project is located in the Mayo Mining district, approximately 40 kilometres ("km") northeast from the village of Mayo, Yukon and 356 km north of Whitehorse, Yukon.
The updated MRE is summarized below in Table 1.
Table 1: Pit-Constrained Indicated and Inferred Mineral Resources - AurMac Project
|
Indicated MRE |
Inferred MRE |
|||||
Deposit |
Au Cut-Off Grade (g/t) |
Tonnage (M Tonnes) |
Gold Grade (g/t) |
Gold Content (Oz) |
Tonnage (M Tonnes) |
Gold Grade (g/t) |
Gold Content (oz) |
Airstrip |
0.30 |
27.7 |
0.69 |
0.611 |
10.1 |
0.75 |
0.245 |
Powerline |
0.30 |
84.8 |
0.61 |
1.663 |
270.4 |
0.60 |
5.208 |
Total Combined |
0.30 |
112.5 |
0.63 |
2.274 |
280.6 |
0.60 |
5.453 |
Notes to Table 1:
The effective date for the MRE is June 28, 2025 and was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., an independent "Qualified Person" within the meaning of NI 43-101.
Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing,changes in global gold markets or other relevant issues.
The CIM Definition Standards were followed for classification of Mineral Resources. The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as an Indicated Mineral Resource.
Mineral Resources are reported at a cut-off grade of 0.30 g/t gold for all deposits, using a US$/CAN$ exchange rate of 0.73 and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$2,050/ounce, US$2.50/t mining cost, US$10.00/t processing cost, US$2.00/t G+A, 90% gold recoveries, and 45° pit slopes.1
The number of tonnes and ounces was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects.
The pit outlines used to constrain the MRE are shown in Figure 1. Detailed images of the Mineral Resource model, including an interactive 3D model and additional information can be found at: https://www.banyangold.com/projects/aurmac/

Figure 1. Plan Map Showing the Mineral Resource Estimate and Drill Collar Locations
1 The gold price and cost assumptions are consistent with current pricing assumptions and costs and, in particular, with those employed for recent technical reports for similar pit-constrained Yukon gold projects.
Qualified Persons
The updated Mineral Resource Estimate for the AurMac Project was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., an independent "Qualified Person" within the meaning of NI 43-101, who has reviewed and approved the contents of this release and has verified the data disclosed as it relates to the MRE. The data was verified by Mr. Jutras using data validation and quality assurance procedures under industry standards.
Duncan Mackay, P.Geo., M.Sc., is a "Qualified Person" as defined under NI 43-101 and has reviewed and approved the content of this news release in respect of all disclosure other than the MRE. Mr. Mackay is Vice President Exploration for Banyan and has verified the data disclosed in this news release, including the sampling, analytical and test data underlying the information
Upcoming Events
-
Precious Metals Summit, Beaver Creek, September 9-12, 2025
Corporate Presentation: September 10 at 8:15 AM MDT
GCFF Conference, Vancouver, September 20, 2025
121 Hong Kong, September 24-25, 2025
New Orleans Investment Conference, November 2-5, 2025
About Banyan
Banyan's primary asset, the AurMac Project is located in Canada's Yukon Territory. The 215.3 square kilometres ("sq km") AurMac Project lies 40 kilometres ("km") from Mayo, Yukon. The AurMac Project is transected by a Yukon highway and benefits from a 3-phase powerline, existing power station and cell phone coverage. Banyan has the right to earn up to a 100% interest, in both the Aurex and McQuesten Properties, respectively, subject to certain royalties.
In addition to the AurMac Project, the Company holds the Hyland Gold Project, located 70 km Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt (the "Hyland Project"). The Hyland Project represents a sediment-hosted, structurally controlled, intrusion-related gold deposit, within a large land package (over 125 sq km), accessible by a network of existing gravel access roads.
Banyan also holds the Nitra Gold Project, a grassroots exploration project located in the Mayo Mining district, approximately 10 km west of the AurMac Gold property. The Nitra Property lies in the northern part of the Selwyn basin and is underlain by metaclastic rocks of the Late Proterozoic Yusezyu Formation of the Hyland Group, similar to lithologies hosting portions of the AurMac Project. Middle Cretaceous Tombstone Plutonic suite intrusions occur along the property including the Morrison Creek and Minto Creek stocks. The property is 100% owned and operated by Banyan Gold Corporation ("Banyan") and covers approximately 313.9 sq km. The property is accessible by road along the Silver Trail Highway, South McQuesten Road and 4x4 roads.
Banyan trades on the TSX Venture Exchange under the symbol "BYN" and is quoted on the OTCQB Venture Market under the symbol "BYAGF". For more information, please visit the corporate website or contact the Company.
ON BEHALF OF BANYAN GOLD CORPORATION
(signed) "Tara Christie"
Tara Christie
President & CEO
For more information, please contact:
Tara Christie • 778 928 0556 • tchristie@banyangold.com
Jasmine Sangria • 604 312 5610 • jsangria@banyangold.com
CAUTIONARY STATEMENT: Neither the TSX Venture Exchange, its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) nor OTCQB Venture Market accepts responsibility for the adequacy or accuracy of this release.
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
FORWARD LOOKING INFORMATION: This news release contains forward-looking information, which is not comprised of historical facts and is based upon the Company's current internal expectations, estimates, projections, assumptions and beliefs. Such information can generally be identified by the use of forwarding-looking wording such as "may", "will", "expect", "estimate", "anticipate", "intend(s)", "believe", "potential" and "continue" or the negative thereof or similar variations. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's plans for exploration; and statements regarding exploration expectations, prospectivity of the Company's property interests, potential mining processes, pricing assumptions and mineral resource estimates; mineral recoveries and anticipated mining costs. Factors that could cause actual results to differ materially from such forward-looking information include uncertainties inherent in resource estimates, continuity and extent of mineralization, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the estimation of mineral resources and the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, and the other risks involved in the mineral exploration and development industry, enhanced risks inherent to conducting business in any jurisdiction, and those risks set out in Banyan's public documents filed on SEDAR. Although Banyan believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
SOURCE: Banyan Gold Corp.
View the original press release on ACCESS Newswire